
Chairman of Nasarawa State Universal Basic Education Board, (NSUBEB) Dr Kassim Muh'd Kassim
By DANJUMA JOSEPH, Lafia –
Chairman of Nasarawa State Universal Basic Education Board, (NSUBEB) Dr Kassim Muh’d Kassim, has revoked 9 contracts awarded 10 months ago by the previous board administration.
Dr Kassim, who announced revocation of the contracts Thursday July 24th 2025 in his office, said the contracts were awarded by the previous board administration about 10 months ago and the contractors failed to report to site up till the present moment.
The NSUBEB chairman, further, explained that, the contracts are for the 2023 projects which are more than 10 months without the various contractors reporting to site and making efforts to report back to the board, as all efforts to reach the affected contractors were unsuccessful.
The contracts revoked includes Lot 102N: Renovation of a block of 2 classrooms with office awarded to Egya Yahuza Agbokawa Nigerian Limited to JSS Nyanyan Gwamdara, Karu LGA. Lot 110N: Renovation of a block of 2 classrooms with office block “C” awarded to Nimus Nigerian Limited at Primary School Ara, Nasarawa LGA.
Lot 142N: Construction of Handpump Borehole awarded to A A Jarimi Global Services at Primary School Maiganga, Wamba LGA. Lot 57N: Construction of 4 Compartment Toilets (Water System) awarded to Nagari Homes Limited at JSS Gadabuke, Toto LGA.
Lot 107N: Renovation of a block of 2 Classrooms with Office awarded to Construction Nigerian Limited at Primary, Ashigye, Lafia LGA. Lot 119N: Renovation of a block of 3 classrooms with 2 office awarded to Tramach Nigerian Limited at Primary School Bassa Central, Kokona LGA
Lot 152N: Construction of Handpump Borehole awarded to Sale Muhammad Waziri Ventures at Primary School Gidan Kuje , Keana LGA. Lot 158N: Construction of Handpump Borehole awarded to Tramach Nigerian Limited at Pilot Science Primary School, Ikka, Nasarawa Eggon LGA
Lot 165N: Construction of Handpump Borehole awarded to Al-Babai Dynamic Concept Nigeria Limited at Zainaku Primary School, Umaisha, Toto LGA.
Dr Kassim urged the 2024 contractors to be mindful of the dates in their award letters and return to site or will face the same action after the expiration of 3 months starting from the date indicated in their contract award letters.




